Stainless Steel Ice Storage Coil Tube — Technical Specification

Product Overview

The Stainless Steel Ice Storage Coil Tube (hereinafter referred to as "Coil Tube") is a precision-engineered serpentine heat exchanger component designed for thermal energy storage systems, particularly in ice-storage-based HVAC (Heating, Ventilation, and Air Conditioning) applications. Manufactured by Wenzhou Jixing Metal Materials Co., Ltd., this product is formed from high-grade austenitic stainless steel wire or tube stock, coiled into a continuous serpentine geometry that maximizes the heat transfer surface area within a compact volume.

Ice storage coil tubes serve as the core heat exchange medium in latent heat storage systems, where phase-change material (typically water-to-ice) absorbs or releases thermal energy during charging and discharging cycles. The coil tube design enables efficient thermal conduction between the refrigerant or brine medium flowing through the tube and the surrounding ice-storage tank, facilitating peak-load shifting, demand-side management, and energy cost optimization in commercial and industrial facilities.

Material Composition & Properties

Base Material

The coil tube is fabricated from austenitic stainless steel conforming to the following international standards:

Typical Alloy Grades

Grade Designation UNS Number Cr (%) Ni (%) Mo (%) C (%) Max Key Characteristics
304 / 06Cr19Ni10 S30400 18.0–20.0 8.0–10.5 — 0.08 Excellent general corrosion resistance; cryogenic toughness
316L / 022Cr17Ni12Mo2 S31603 16.0–18.0 10.0–14.0 2.0–3.0 0.03 Superior chloride pitting resistance; low-carbon for weldability
321 / 06Cr18Ni11Ti S32100 17.0–19.0 9.0–12.0 — 0.08 Titanium-stabilized; excellent intergranular corrosion resistance

Mechanical Properties (Annealed Condition, ASTM A269)

Property 304 Grade 316L Grade Test Standard
Tensile Strength (Rm) ≥ 515 MPa ≥ 485 MPa ASTM E8
Yield Strength (Rp0.2) ≥ 205 MPa ≥ 170 MPa ASTM E8
Elongation (A50mm) ≥ 40 % ≥ 40 % ASTM E8
Hardness (HRB) ≤ 95 ≤ 92 ASTM E10
Density (ρ) 8.00 g/cm³ 8.03 g/cm³ —
Thermal Conductivity (20°C) 16.3 W/(m·K) 14.6 W/(m·K) ASTM E1461
Coefficient of Thermal Expansion (20–100°C) 17.3 × 10⁻⁶ /K 16.0 × 10⁻⁶ /K ASTM E228

Cryogenic Performance

Stainless steel coil tubes exhibit exceptional ductility and toughness retention at cryogenic temperatures (−196°C to −40°C), making them inherently suitable for ice-storage applications where the internal medium may reach sub-zero brine temperatures. Unlike carbon steel, austenitic stainless steels do not undergo a ductile-to-brittle transition, ensuring reliable performance throughout repeated freeze-thaw cycles.

Detailed Specifications

Parameter Specification Range Notes
Tube Outer Diameter (OD) 6.35 mm – 25.4 mm (¼" – 1") Custom sizes available
Tube Wall Thickness 0.5 mm – 2.0 mm Dependent on design pressure
Tube Inner Diameter (ID) Calculated per OD and wall thickness —
Coil Pitch (Center-to-Center Spacing) 10 mm – 50 mm Determined by heat transfer requirements
Coil Diameter 100 mm – 600 mm Adapted to tank geometry
Coil Length (Uncoiled) 5 m – 150 m per assembly Continuous coil configuration
Design Pressure 0.5 MPa – 2.5 MPa Per ASME BPVC Section VIII Div. 1
Operating Temperature Range −40°C to +150°C Cryogenic to moderate thermal
Surface Finish Ra ≤ 1.6 µm (standard); Ra ≤ 0.4 µm (polished) Electropolished option available
End Preparation Beveled per ASME B16.25; Flanged per ASME B16.5 Custom end configurations available
Tolerance — OD ±0.1 mm (standard); ±0.05 mm (precision) Per ASTM A269
Tolerance — Wall Thickness ±10 % of nominal Per ASTM A269
Material Condition Solution Annealed (SA) / Pickled & Passivated No cold work residual stress

Manufacturing Process

1. Raw Material Selection & Incoming Inspection

Coil tube production commences with the procurement of certified seamless stainless steel tube stock (ASTM A269) or precision-drawn tube from accredited mills. Each lot undergoes rigorous incoming inspection including:

2. Forming & Coiling

The serpentine coil geometry is achieved through precision cold-forming using CNC-controlled coiling machines. The process involves:

  1. Feed Preparation: Straight tube stock is fed into the forming head at controlled speeds to ensure uniform plastic deformation.
  2. Progressive Bending: Multi-roll forming heads progressively bend the tube into the desired serpentine pitch and coil diameter. Bending radii are maintained at a minimum of 3D (three times the tube outer diameter) to prevent ovality and wall-thinning.
  3. Spring-Back Compensation: CNC systems incorporate real-time spring-back compensation algorithms to achieve dimensional accuracy within ±0.5 mm tolerance on coil geometry.
  4. Continuous Coiling: The formed tube is wound onto precision mandrels or directly into the assembly configuration, maintaining consistent pitch throughout the entire length.

3. Welding (if multi-pass assembly is required)

For extended coil assemblies exceeding single-length tube stock, butt-welding or orbital TIG (Tungsten Inert Gas) welding is employed:

4. Heat Treatment & Passivation

Following forming and welding, the coil tube assembly undergoes:

  1. Solution Annealing: Heating to 1050°C–1100°C in a controlled atmosphere furnace (H₂ or vacuum) to dissolve carbides, relieve cold-work stresses, and achieve maximum ductility.
  2. Quenching: Rapid water or air quenching to stabilize the austenitic structure.
  3. Pickling & Passivation: Immersion in a mixed acid bath (HNO₃/HF) to remove heat treatment scale and form a chromium-oxide passive film. Passivation verified per ASTM A967.

5. Final Inspection & Testing

Applications

Primary Applications

Ice Storage System Integration

In ice storage systems, the coil tube is typically mounted within a large insulated tank (typically 20,000 to 500,000 liters capacity). During the charging cycle, sub-zero brine flows through the coil tube, transferring heat to the surrounding water and forming ice layers on the tube exterior. During the discharging cycle, warm return water from the building flows through the coil, absorbing latent heat from the melting ice. The stainless steel coil tube provides:

Hoisting, Handling & Installation Guidelines

Hoisting & Rigging

Proper hoisting and rigging procedures are critical to maintaining the dimensional integrity and structural soundness of the coil tube assembly during transport and installation:

  1. Lifting Points: Use certified lifting slings or spreader bars attached at designated lifting points (typically at the inlet and outlet headers). Never lift by the coil body directly.
  2. Sling Angle: Maintain sling angles of 60° or greater from horizontal to minimize lateral loads on the coil geometry.
  3. Load Capacity: Verify the weight of the assembled coil tube (including brine fill weight if applicable) and select lifting equipment with a minimum safety factor of 5:1.
  4. Shock Prevention: Employ soft-lay slings (nylon or rubber-wrapped) to prevent localized denting or deformation of the stainless steel tube surface.
  5. Slow, Controlled Movement: Avoid sudden acceleration or deceleration that could induce inertial loads causing coil distortion.

Installation Procedures

  1. Site Preparation: Ensure the ice storage tank interior is clean, free of debris, and that mounting brackets or support saddles are properly positioned and leveled.
  2. Coil Placement: Carefully lower the coil tube assembly into the tank, maintaining the serpentine geometry orientation. Support the coil at intervals not exceeding 1.5 meters to prevent sagging.
  3. Header Connection: Connect the inlet and outlet headers to the building's refrigeration or hydronic piping system using appropriate flanges, fittings, or welded connections. Apply PTFE tape or anaerobic thread sealant to threaded joints.
  4. Expansion Accommodation: Install expansion loops or flexible connections at the header interfaces to accommodate thermal expansion and contraction of the coil tube during operating cycles (ΔT up to 190°C).
  5. Pressure Testing: Conduct a system-wide hydrostatic pressure test at 1.5× the maximum design pressure. Hold for a minimum of 2 hours with zero allowable pressure drop.
  6. Passivation Verification: After installation, perform a final passivation check