Q215 Fan Coil Pipe System — Stainless Steel Coil Tube Technical Specification

1. Product Overview

The Q215 Fan Coil Pipe System (Product No. 272) is a precision-engineered coil tube assembly designed for integration into HVAC (Heating, Ventilation, and Air Conditioning) fan coil units manufactured by Wenzhou Jixing Metal Materials Co., Ltd. This product is specifically engineered to address critical performance challenges identified through systematic root-cause analysis of pipe leakage in commercial and industrial fan coil applications. The coil tube serves as the primary heat exchange conduit, facilitating efficient thermal transfer between the circulating working fluid and ambient air streams.

Based on extensive field data and failure-mode analysis (as documented in the study "Analysis of Leakage Causes in Q215 Fan Coil Pipe Systems"), this product incorporates design refinements targeting the principal failure mechanisms: material fatigue, thermal expansion mismatch, corrosion-induced wall thinning, and manufacturing defect propagation.

2. Material & Properties

The base material conforms to GB/T 700-2006 (Carbon and Low Alloy Structural Steels) with the Q215 grade designation, supplemented by stainless steel components (304/316L grades) for corrosion-critical joints and end fittings.

3. Technical Specifications

Parameter Specification Standard / Test Method
Outer Diameter (OD) 6.35 mm / 9.52 mm / 12.7 mm / 15.88 mm ASME B36.19M
Wall Thickness (WT) 0.50 mm – 1.50 mm (±0.05 mm tolerance) GB/T 14976
Coil Length 12 m – 50 m (customizable) —
Bend Radius (Minimum) ≥ 3D (D = outer diameter) ISO 13072
Surface Finish Ra ≤ 0.8 μm (internal); Ra ≤ 1.6 μm (external) GB/T 1031
Heat Exchange Efficiency U-value ≥ 85 W/(m²·K) ASHRAE Standard 15
Flow Velocity (Nominal) 0.5 – 2.5 m/s —
Fin Spacing 2.5 mm – 4.0 mm —
Fin Material Aluminum 1100 (bonded) or Stainless Steel 304 (welded) —
End Connection Type Flared / Threaded (G1/2"–G1") / Brazed / Soldered ASME B1.20.1

4. Manufacturing Process

  1. Material Selection & Incoming Inspection: Raw coil stock undergoes spectrographic verification (OES analysis) to confirm chemical composition compliance with Q215 / 304L specifications.
  2. Slitting & Leveling: Precision slitting to target width followed by cold-rolled leveling to eliminate coil set and ensure dimensional flatness within ±0.1 mm/m.
  3. Tube Forming (ERW / Induction Welding): Electric Resistance Welding (ERW) or High-Frequency Induction Welding (HF-IW) process produces seamless-grade weld quality with weld bead strength ≥ 95% of base metal tensile strength.
  4. Coiling & Fin Application: Tubes are precision-coiled to specified pitch and diameter. Aluminum fins are bonded via resistance welding or mechanically crimped for maximum thermal contact.
  5. Hydrostatic Pressure Testing: Every coil tube assembly is subjected to hydrostatic testing at 1.5× working pressure (≥ 2.4 MPa) for a minimum dwell time of 30 seconds to detect micro-porosity or weld defects.
  6. Non-Destructive Testing (NDT): 100% ultrasonic flaw detection (UT) per GB/T 12606 and eddy current inspection (ECI) of weld seams per ASTM E309.
  7. Surface Treatment & Passivation: Stainless steel components undergo acid pickling and passivation (nitric acid/hydrofluoric acid blend) to ensure chromium oxide film integrity.
  8. Final Assembly & Leak Testing: End fittings are crimped, brazed, or threaded and subjected to helium leak testing (detection sensitivity ≤ 1×10⁻⁹ Pa·m³/s).

5. Applications

6. Quality Certifications & Compliance

7. Unique Selling Points — Leakage Prevention Engineering

Wenzhou Jixing Metal Materials Co., Ltd. has applied findings from the "Q215 Fan Coil Pipe Leakage Root-Cause Analysis" study directly to product design, resulting in the following differentiators:

8. Installation & Maintenance Recommendations

  1. Ensure water quality compliance: pH 6.5–8.5, dissolved oxygen ≤ 0.1 mg/L, hardness ≤ 100 ppm CaCO₃ equivalent.
  2. Install strainers (≥ 40 mesh) upstream of the coil tube assembly to prevent particulate ingress.
  3. Perform annual hydrostatic pressure testing and biennial endoscope inspection of internal surfaces.
  4. Apply dielectric unions at all dissimilar metal junctions to prevent galvanic corrosion.
  5. Observe minimum bend radii during field modifications to avoid cold-work hardening and crack initiation.

9. Packaging & Delivery

Each coil tube assembly is wound on a steel core reel, wrapped in moisture-barrier polyethylene film, and secured with steel strapping. Shipping documentation includes Material Test Reports (MTR), NDT certificates, dimensional inspection reports, and a Certificate of Conformity (CoC). Lead time: 15–30 calendar days from order confirmation, depending on specification complexity and order quantity.