Stainless Steel Coil Tube — Arrival Inspection Protocol (Acceptance Criteria Specification)

1. Product Overview

The Stainless Steel Coil Tube (also referred to as Coiltube or Coiled Tubing) is a continuous-length, cold-worked stainless steel pipe supplied in the form of a coil for downstream processing, fabrication, and installation. Manufactured by Wenzhou Jixing Metal Materials Co., Ltd, this product is engineered for high-precision industrial applications where dimensional accuracy, mechanical integrity, and corrosion resistance are critical performance parameters.

This specification document defines the Arrival Inspection Protocol (到货检验协议) — a pre-agreed contractual framework governing the acceptance criteria upon delivery. The protocol establishes the Positive Material Identification (PMI) re-inspection ratio, Non-Destructive Testing (NDT) sampling plan, and Non-Conformance Handling Process (不合格处理流程). The primary objective of this protocol is to eliminate post-delivery disputes by establishing mutually agreed-upon inspection standards, tolerances, and remediation procedures prior to shipment.

Core Principle: All inspection parameters, acceptance thresholds, and dispute resolution mechanisms are pre-defined in the contract to prevent ambiguity and ensure traceability throughout the supply chain.

2. Material & Properties

2.1 Material Grades

Coil tubes are typically manufactured from austenitic and duplex stainless steel grades, selected based on the end-use application requirements:

2.2 Chemical Composition Requirements

Chemical composition is verified per ASTM E1412 (Optical Emission Spectrometric Analysis) and ASTM E135 (X-Ray Fluorescence Spectrometric Analysis). Key elemental limits include:

2.3 Mechanical Properties

3. Specifications — Arrival Inspection Protocol

3.1 PMI Re-Inspection Ratio (Positive Material Identification)

PMI re-inspection is a mandatory contractual requirement to verify that the delivered material grade matches the specified order. The protocol defines the following sampling framework:

Parameter Requirement Standard Reference
PMI Testing Method Handheld X-Ray Fluorescence (XRF) Spectrometry ASTM E135 / ASTM E1412
Sampling Ratio — Standard Orders 1 coil per lot (minimum 1 unit per heat number) Contract Annex A
Sampling Ratio — Critical Applications 10% of coils per lot (minimum 3 units) Contract Annex A
Sampling Ratio — First Article / New Grade 100% PMI verification on first 3 coils Contract Annex A
Acceptance Criteria All measured values within ±0.5% of specified grade composition ASTM E135
Testing Location Outer surface of coil, 500 mm from each end Manufacturer SOP
Documentation Digital PMI report with operator certification attached to Mill Test Report (MTR) ISO 9001:2015 Clause 8.7

3.2 NDT Sampling Plan (Non-Destructive Testing)

Non-Destructive Testing is applied to verify internal and surface integrity without compromising product usability. The following NDT methods and sampling protocols are pre-agreed:

NDT Method Application Sampling Frequency Acceptance Criteria Standard
Eddy Current Testing (ECT) Internal defect detection (inclusions, laminations, cracks) 100% inline during production; 5% post-production re-verification No defects exceeding 25% of wall thickness ASTM E309 / ASTM E709
Magnetic Particle Inspection (MPI) Surface and near-surface defect detection 10% of coils per lot (minimum 2 units) No linear indications > 6 mm length ASTM E1444
Visual Inspection (VT) Surface quality, dimensional accuracy, packaging integrity 100% of coils at point of dispatch No visible defects per ASTM A312 Section 10 ASTM A312 / ISO 17638
Hydrostatic Testing (HT) Pressure integrity verification 100% inline; sampling re-test 3% per lot No leakage at 1.5× design pressure for 30 seconds ASTM A312 / EN 10216-5
Ultrasonic Testing (UT) Wall thickness measurement and internal flaw detection 5% of coils per lot (minimum 2 units) No internal reflectors exceeding 15% DAC level ASTM E1316

3.3 Non-Conformance Handling Process

The Non-Conformance Handling Process is a structured, pre-agreed escalation and remediation framework designed to resolve quality discrepancies without disrupting supply continuity. The process follows the following sequential steps:

  1. Step 1 — Identification & Quarantine: Upon detection of a non-conforming coil, the receiving party immediately isolates the affected material and notifies the supplier within 24 hours via written communication (email or formal Non-Conformance Report).
  2. Step 2 — Verification & Re-Testing: Both parties agree on an independent third-party laboratory for re-verification testing. Results are binding if the laboratory holds ISO/IEC 17025 accreditation.
  3. Step 3 — Classification: Non-conformances are classified as:
    • Class A (Critical): Material grade mismatch, mechanical properties below minimum, or safety-critical defect — full lot rejection.
    • Class B (Major): Dimensional deviation exceeding tolerance by >50%, surface defect requiring rework — affected coils rejected, remainder of lot subject to 100% inspection.
    • Class C (Minor): Cosmetic imperfections, minor dimensional variance within 50% of tolerance — acceptable with documented concession or price adjustment.
  4. Step 4 — Remediation: Options include return for replacement, on-site rework at supplier's cost, price concession, or mutual agreement on use-as-is with documented risk acceptance.
  5. Step 5 — Root Cause Analysis & CAPA: Supplier submits a Corrective and Preventive Action (CAPA) report within 10 working days, including root cause analysis, containment actions, and preventive measures.
  6. Step 6 — Closure: Non-conformance is formally closed only upon written confirmation from both parties that remediation is satisfactory.

3.4 Inspection Timeline & Responsibilities

Activity Responsible Party Timeline Deliverable
Visual & dimensional inspection Buyer / Third-party inspector Within 3 working days of delivery Inspection Report
PMI verification Buyer (or designated lab) Within 5 working days of delivery PMI Certificate
NDT sampling Buyer / Third-party NDT agency Within 7 working days of delivery NDT Test Report
Non-conformance notification Buyer Within 24 hours of detection Non-Conformance Report (NCR)
Supplier response & remediation plan Supplier Within 48 hours of NCR receipt Remediation Proposal
CAPA report submission Supplier Within 10 working days CAPA Report

4. Manufacturing Process

The stainless steel coil tube production process at Wenzhou Jixing Metal Materials Co., Ltd follows a controlled sequence ensuring dimensional precision and metallurgical integrity:

  1. Hot Rolling: Billet material is heated to 1200°C–1300°C and pierced to form hollow tubes.
  2. Intermediate Annealing: Tubes are annealed to relieve residual stresses and restore ductility for cold working.
  3. Acid Pickling & Descaling: Surface scale is removed via controlled acid bath treatment (HNO₃/HF blend).
  4. Cold Drawing / Cold Reduction: Tubes pass through multiple die stations to achieve final dimensions with tight tolerances (±0.05 mm).
  5. Final Annealing: Solution annealing at 1050°C–1150°C followed by rapid quenching to achieve austenitic microstructure.
  6. Coiling: Finished tubes are wound into coils with controlled tension to prevent deformation.
  7. Final Inspection: 100% inline ECT, hydrostatic testing, and dimensional verification prior to coiling.

5. Applications

6. Quality Certifications

The arrival inspection protocol is supported by the following quality management certifications and standards compliance:

7. Unique Selling Points — Arrival Inspection Protocol

"Pre-agreed acceptance criteria eliminate post-delivery disputes."

8. Conclusion

The Arrival Inspection Protocol represents Wenzhou Jixing Metal Materials Co., Ltd