Hydrogen-Induced Cracking (HIC) Resistance — NACE TM0284 Certified Stainless Steel Coil Tube

Product Reference: Wenzhou Jixing Metal Materials Co., Ltd. | Item No. 109 | Coil Tube (Coiltube)

Test Standard: NACE TM0284 — Hydrogen-Induced Cracking (HIC) Resistance

1. Product Overview

The Coil Tube product line from Wenzhou Jixing Metal Materials Co., Ltd. is specifically engineered and qualified for sour service environments where hydrogen sulfide (H₂S) is present in significant concentrations. This product has been rigorously evaluated for Hydrogen-Induced Cracking (HIC) resistance in accordance with NACE International Technical Manual TM0284, a globally recognized standard for assessing the susceptibility of materials to HIC in sour environments.

HIC is a form of hydrogen damage that occurs in materials exposed to H₂S-containing environments. Unlike Hydrogen-Induced Blistering (HIB), HIC involves the formation of internal crack networks parallel to the material surface, which can lead to catastrophic loss of mechanical integrity. This coil tube has been demonstrated to resist HIC through a validated 96-hour H₂S saturated solution immersion test, ensuring reliability in the most demanding downhole and surface applications.

1.1 Regulatory Framework

2. Material and Properties

2.1 Applicable Material Grades

The coil tube is manufactured from high-grade stainless steel alloys selected for superior resistance to hydrogen damage. Typical grades include:

2.2 Mechanical Properties

Property 304 / 304L 316 / 316L 321 310 / 310S
Tensile Strength (MPa, min.) 515 515 515 515
Yield Strength (MPa, min.) 205 205 205 205
Elongation (%) ≥40 ≥40 ≥40 ≥40
Hardness (HB, max.) 217 217 217 217
Density (g/cm³) 8.00 8.03 8.00 8.03

2.3 Chemical Composition (Typical, wt%)

Element 304 / 304L 316 / 316L 321 310 / 310S
C (Carbon) ≤0.08 / ≤0.03 ≤0.08 / ≤0.03 ≤0.08 ≤0.20 / ≤0.08
Cr (Chromium) 18.0–20.0 16.0–18.0 17.0–19.0 24.0–26.0
Ni (Nickel) 8.0–10.5 10.0–14.0 9.0–13.0 19.0–22.0
Mo (Molybdenum) — 2.0–3.0 — —
Ti (Titanium) — — 5×C – 0.70 —
P (Phosphorus, max.) 0.045 0.045 0.045 0.045
S (Sulfur, max.) 0.030 0.030 0.030 0.030

3. HIC Testing Specification — NACE TM0284

3.1 Test Protocol

The HIC resistance of this coil tube is verified through a standardized immersion test in accordance with NACE TM0284. The test protocol is as follows:

  1. Test Solution Preparation: A pH 3.5 sodium bisulfate (NaHSO₃) solution is prepared and saturated with hydrogen sulfide (H₂S) gas to achieve a dissolved H₂S concentration of approximately 3,000 ppm (2.1 atm H₂S partial pressure). The solution is maintained at 23 ± 1 °C.
  2. Specimen Preparation: Test specimens are machined from representative coil tube material, with the test surface parallel to the rolling direction to simulate worst-case internal cracking orientation.
  3. Immersion Duration: Specimens are immersed in the H₂S-saturated solution for a minimum of 96 hours (four days).
  4. Post-Test Evaluation: After immersion, specimens are removed, cleaned, and examined for internal HIC damage using cross-sectional microscopy. The maximum crack length (in both rolling and transverse directions) is measured and compared against acceptance criteria.
  5. Acceptance Criteria: The material must exhibit a maximum HIC crack length of ≤ 50% of the specimen width (or as specified by the applicable project standard, typically ≤ 25% for critical applications).

3.2 HIC Test Results Summary

Parameter Specification Requirement Status
Test Standard NACE TM0284 — Compliant
Test Solution pH 3.5 NaHSO₃, H₂S-saturated 3,000 ppm H₂S Compliant
Temperature 23 ± 1 °C 23 ± 1 °C Compliant
Immersion Duration 96 hours ≥ 96 hours Compliant
Maximum Crack Length (Rolling Direction) Measured value ≤ 50% specimen width Pass
Maximum Crack Length (Transverse Direction) Measured value ≤ 50% specimen width Pass
MR0175 Sour Service Qualification — Mandatory Qualified

3.3 Relationship Between HIC and MR0175 Compliance

Note: HIC testing per NACE TM0284 is a mandatory inspection item for all sour service tubing and piping materials that must comply with NACE MR0175 / ISO 15156. This standard governs the selection, design, and qualification of materials used in oil and gas production environments containing H₂S. Failure to pass HIC testing renders a material ineligible for sour service applications.

4. Manufacturing Process

4.1 Production Workflow

  1. Raw Material Procurement: Certified stainless steel slab or strip from approved mills, with full chemical composition and mechanical property traceability.
  2. Hot Rolling / Cold Rolling: The coil tube blank is processed through precision rolling mills to achieve the target dimensions and surface finish. Cold rolling provides superior dimensional accuracy and surface quality.
  3. Coiling / Forming: The rolled strip is precisely formed and coiled into tube geometry using automated forming equipment, ensuring consistent wall thickness and ovality control.
  4. Solution Annealing: The formed coil tube is subjected to solution annealing at 1010–1150 °C followed by rapid water quenching to restore full austenitic microstructure, eliminate residual stresses, and maximize corrosion resistance.
  5. Pickling and Passivation: Surface oxides and scale are removed through acid pickling, followed by passivation to restore the protective chromium oxide film.
  6. Non-Destructive Testing (NDT): The coil tube undergoes 100% eddy current testing (ECT) and/or ultrasonic testing (UT) to detect internal and surface defects.
  7. HIC Testing (NACE TM0284): Representative specimens are extracted from each heat lot and subjected to the 96-hour H₂S saturated solution immersion test as described in Section 3.
  8. Final Inspection and Packaging: Dimensions, surface quality, and documentation are verified prior to packaging and shipment.

4.2 Key Process Controls for HIC Resistance

5. Applications

5.1 Primary Applications

5.2 Environmental Conditions

"Professional Coil Tubes, Professionally Made"
Technical Inquiry: jixingmetal@126.com Tel:+86-18632712459(Wechat)
© 2026 Wenzhou Jixing Metal Materials Co., Ltd · This content is for technical reference only. Final order specifications are subject to the signed contract and mill test certificate.
Parameter Operating Range Notes
H₂S Partial Pressure Up to 100% (full sour) Qualified per MR0175 / ISO 15156